//The systems for controlling the flow of water at heat pumping stations of PJSC “Kyivenergo” have been implemented

The systems for controlling the flow of water at heat pumping stations of PJSC “Kyivenergo” have been implemented

As part of the modernization of the heat pumping stations Poznyaki, Obolon, Voskresenka, Zhilyanskaya of the organization unit “Kiev Thermal Network”, 4 systems for control and management of pump units were installed to improve the accuracy of hot water consumption in residential areas of Kiev and reduce electricity costs.

Within the framework of the projects, adjustable VOITH TURBO hydraulic couplings and automation equipment based on PLC and SIMATIC S7 human-machine interface were installed.

2019-07-08T11:07:21+03:00