//The control system for the turbine and the main parameters of the boiler of the power unit No. 12 at the Starobeshevskaya TPP, PJSC Donbassenergo was implemented

The control system for the turbine and the main parameters of the boiler of the power unit No. 12 at the Starobeshevskaya TPP, PJSC Donbassenergo was implemented

The turbine control system K-200-130 and the regulation of the main parameters of the boiler TП-100 of the power unit st. No. 12 of the Starobeshevskaya TPP, PJSC Donbassenergo was implemented on the basis of the software and hardware complex SIEMENS PCS7. As part of the project, work was carried out on replacing control valves and partial replacement of instrumentation, the hydraulic part of the existing system was modernized.

The project was carried out as part of the modernization of the power unit st. No. 12 together with the reconstruction of the boiler, turbine, repair of the generator and the construction of a new gas-cleaning electric precipitator.