//Control system of the pump group for the power unit of the waste incineration boiler

Control system of the pump group for the power unit of the waste incineration boiler

Construction of a cascade control circuit for pumping units through the VFD, soft starters with the installation of a local monitoring and control system.

Works being performed:

• drive control and automation system design
• equipment supply
• package of installation works
• package of commissioning works
• acceptance tests

SIEMENS equipment of the series SIMATIC S7 and SINAMICS is being used when implementing the project.

2019-07-05T16:20:26+03:00