#: 1
Project: Turbine shop CHP. Electronic part of control system for the Turbine control (Turbine 35MW)
Direction: Automation
Customer: PJSC "Zaporizhstal"
Automation object/equipment: Turbine unit st. №1 CHP, PCS7, SITRANS, AUMA
Work performed: Detailed engineering, equipment supply, dismantling, installation and commissioning work.
Start: 2019
End: 2019
Work Status: Completed
#: 2
Project: Boiler shop at CHP. Automatic control system of heat load of boilers 2, 4, 5, 6, 7
Direction: Automation
Customer: PJSC "Zaporizhstal"
Automation object/equipment: Boiler units 2, 4, 5, 6, 7, PCS7, SITRANS, AUMA
Work performed: Detailed engineering
Start: 2019
End: 2019
Work Status: Completed
#: 3
Project: Process control system of the boiler shop of the Khorostkovsky sugar factory. The project for converting boilers to solid fuel.
Direction: Automation
Customer: Radekhovsky Sakhar LLC
Automation object/equipment: RADIANT boiler unit - 3 pcs. SIMATIC S7
Work performed: Selection and supply of automation equipment
Start: 2019
End: 2019
Work Status: Completed
#: 4
Project: Process control system of sinter machine №4
Direction: Automation
Customer: PJSC "AMKR", Subsidiary Undertaking „Siemens Ukraine”
Automation object/equipment: Algorithmic part of the control system based on PCS7
Work performed: Software development, commissioning
Start: 2019
End: -
Work Status: Ongoing
#: 5
Project: Electronic part of sinter and coke weight funnels
Direction: Automation
Customer: PJSC "MMKI", Subsidiary Undertaking „Siemens Ukraine”
Automation object/equipment: System for weighing sinter and coke fed to blast furnace No. 5
Work performed: Software development, commissioning
Start: 2019
End: 2019
Work Status: Completed
#: 6
Project: Kiev CHP-6, power unit st. №1,Technical re-equipment of vibration state monitoring system
Direction: Automation, Software development
Customer: Housing community KIEVTEPLOENERGOPromvitech LLC
Automation object/equipment: Turbine generator st. №1Vibration Monitoring SystemVibrovizor, Simatic S7
Work performed: Engineering, software development, equipment supply, commissioning
Start: 2019
End: -
Work Status: Ongoing
#: 7
Project: Online monitoring system of technological equipment for pumping stations
Direction: Automation
Customer: Housing Community, Novopetrivsky KKP
Automation object/equipment: Borehole and network pumping units of pumping stations in the village Novi Petrivtsi, Kiev region.
Work performed: Engineering and manufacture of automation panels, software and WEB interface development
Start: 2019
End: 2019
Work Status: Completed
#: 8
Project: Automated process control system for pelletizing charge materials for the OK-306 indurating machine
Direction: Automation
Customer: Metinvest Engineering LLC, PrAT SEVGOK
Automation object/equipment: Process control of the main and auxiliary equipment for pan pelletizers, workshop section 306
Work performed: Hardware and software design, equipment supply, installation and commissioning
Start: 2018
End: 2020
Work Status: Completed
#: 9
Project: Modernization of the process monitoring and control system of the boiler dusting system of the power unit No. 10 within the framework of the boiler conversion to gas group coals.
Direction: Automation
Customer: Elektronaladka LLC, DTEK Pridneprovskaya TPP
Automation object/equipment: Software and hardware complex
Work performed: Hardware and software design, equipment supply, installation and commissioning
Start: 2018
End: 2019
Work Status: Completed
#: 10
Project: Reconstruction of the gas cleaning system of the iron desulphurization department of the converter shop
Direction: Automation
Customer: Metinvest Holding LLC, PrAT “MK“ Azovstal ”
Automation object/equipment: Automation Cabinets
Work performed: Automated process control systems manufacture
Start: 2018
End: 2019
Work Status: Completed